Home       Site Map
Lifting of a column weighing 1,350Te in Abu Dhabi, UAE
Lifting of a propylene propane splitter weighing 1,350Te utilising our heavy duty cranes
Load out of a rig weighing 8,000 Te at Hamriyah, Sharjah, UAE.
Load out of a rig weighing 8,000Te onto a semi submergible barge utilising our self propelled modular trailers.
Lifting operations in Australia
Lifting operations using our Demag CC 2500 (500 te capacity crawler crane).
Inland transportation of an Absorber weighing 1,130Te in Doha, Qatar
Transportation of an Absorber weighing 1,130Te from jetty to project site utilising our self propelled modular trailers.
Tailing operation of an Absorber weighing 1,130Te Doha, Qatar
Tailing operation of an Absorbers weighing 1,130Te utilising our tailing frame, 10 axle lines of SPMTs and 2 power packs.
Lifting of an Absorber weighing 1,130Te in Doha, Qatar
Tailing and lifting of an Absorber weighing 1,130Te in a gas project utilising our heavy duty crane, our tailing frame and SPMTs.
Pages 1 of 10  Go to Page